Machines and equipment for dates and derivatives manufacturing .........
1) Dates Cleaning and packaging lines:- 
 a) Cleaning and packing dates line. (1.8 ton / h)
General deion: - full automatic line production of latest European technology for  cleaning , sorting, washing, drying of dates and both of "vacuum"  or "rigid" packaging method.
Production line Length: 43  meters
Production capacity : 1800 Kg / h
final product Templates  : (3) which determined by the client
workers required : 18 workers.
manufacturing countries : German / Turkish
Other advanes : does not require anything except electricity and packing materials (rolls and cartons).
b) Cleaning and packing dates line. (700 Kg / h)
General deion: - full automatic line production of latest European technology for  cleaning , sorting, washing, drying dates and both of "vacuum" packaging method &  "rigid" packaging method.
Production line Length: 21  meters
Production capacity : 700 Kg / h
final product Templates  : (1) which determined by the client 
workers required : 8 workers.
manufacturing countries : German / Turkish
Other advanes : does not require anything except electricity and packing materials (rolls and cartons).
2) Maamoul production line:- 
 Final Product of line:Date maamoul , Date bars and Maamoul fingers 
General deion: production line for  maamoul fill with date where the dates are added Inside dough of flour and then formed  as a final product by Templates which determined by the client  finally maamoul  packed by a flow pack  machine  .
Production line Length: 10 meters
Final product Templates  : 2 Templates determined by the client
Production capacity: 540 kg / h
workers required :    workers.
3) Dates Molasses production line:-
General Deion: Date Molasses production line (Date Syrup).
Production line Length: 13 meters
Final product Templates  : (2) Templates determined by the client
Production capacity: 2 tons / 8 hours
Production capacity: 4 tons / 8 hours
Production capacity: 6 tons / 8 hours
workers required :  4  workers.
production line:-4) Dates Paste
General Deion: first, disposal of seeds then grinding dates to produce a paste of dates>
Product : a paste of dates
Final product Templates  :: 2 Templates determined by the client
Production capacity:  250 kg / h   &    400 kg / h
workers required :  4  workers.
Mariat for Trade & Industry
Marketing Manager                                                                          Asst. Marketing Manager
Jamal Sayani                                                                                       Mohammed Abd El Sattar 
 : 00966533391010Mobil00966555127451Mobil: